by Thodoris Tsenoglou | Jan 29, 2026
Construction of a breakwater 122 m long, and construction of a quaywall 230m long. Construction of an access road and a vehicle bridge connecting the access road with the quaywall....
by Thodoris Tsenoglou | Jan 29, 2026
Construction of a 240 m breakwater with natural rock armor and rockfill foundation. Extension of the existing pier by 165 m in total length, and widening of its core structure....
by Thodoris Tsenoglou | Jan 29, 2026
Development of Marina Infrastructure for 45 yachts. Dredging of the harbor basin and construction of a 180-meter quay wall with protective wall and a 180-meter breakwater....
by Thodoris Tsenoglou | Jan 28, 2026
A highly demanding marine infrastructure project on the legendary Skorpios Island, involving the construction of new marinas in the Panagitsa area. The works included the construction of a 100m quay with external armor protection, as well as the installation of a new...